Our installation process
Seven stages, with one point of contact throughout.
- 01
Site survey
We measure the lift-well, pit and overhead and check the power supply.
- 02
Recommendation and quotation
Lift type, capacity, finishes and an itemised quotation.
- 03
Drawings
Layout drawings for your architect and civil contractor.
- 04
Site preparation
Civil work and electrical supply are prepared to the drawings.
- 05
Installation
Rails, car, doors, machine and controller are installed by our team.
- 06
Testing and commissioning
Safety devices and ride quality are checked before handover.
- 07
Handover
We show you how to use the lift and book the first service visit.
Ready to start?
Tell us about your building and we will plan the first step with you.
Request a quote
Plan the lift early
The lift-well, pit and overhead are part of your building’s structure. Planning them before construction avoids costly changes later.
Lift-well
The shaft the lift travels in. Its width (C) and depth (D) set the size of the car.
Pit
The depth the lift needs below the lowest floor.
Overhead
The height the lift needs above the top floor.
Power supply
A suitable electrical supply, checked at the site survey.
- Skilled
installation team - Safety checks before
handover - One point of
contact throughout - First service visit
booked at handover